Start off of the right foot.
After any kind of new installation, Acceptance testing must be run to ensure that your new equipment meets all specified requirements for function and design. Our TEGG professionals will perform a thorough examination of your new system – checking for a variety of potential issues and make sure that when you finally flip the switch for good, that everything is working as it should.
Powering a new system is a unique event and could potentially expose the rest of the system to problems. By running an acceptance test, you not only prevent small issues from becoming big ones, but it also serves as the baseline for all future reoccurring maintenance on the system.
We offer a number of Acceptance Testing services, including:
- Visual Inspection for code compliance
- Thorough cleaning & lubrication
- Electrical insulator testing
- Contact resistance testing
- Current injections
- CT testing
- Evaluation of short circuit and coordination studies
- Review & verification of circuit breaker trip settings
- Infrared & ultrasonic survey
- Review of as-built drawings
- And More!
According to Manufacturers, nearly 30% of installed equipment doesn’t function properly once it’s activated for the first time. Call TEGG today and set up an appointment to have our experienced team check your new system and prevent minor problems from becoming big ones.